Phase Two

So through careful investigation over the past few weeks, our team has surmised what looks like a functioning battery. To our knowledge, this battery has to be powered by Renewables for it to safely function properly.

The diagram that you will find in the rendering safely specifies that:

2.5 gallons of water are required to electrolyze 1 kg H2 if it takes 65 KWh to electrolyze hydrogen from water and then compress it to recycle in the Full Cell System.

Previous
Previous

Project One

Next
Next

Project Three